Permitted, reported, and ready for the knock on the door.
Air permitting, stormwater coverage and the reporting calendar that never stops, handled so operations keep running and agencies stay satisfied.
Texas Permits by Rule under 30 TAC 106, case-by-case NSR when a PBR doesn't fit, federal NSPS and NESHAP applicability, and ODEQ permitting across the state line.
Multi-Sector General Permit applicability, sector determinations, SWP3 development, benchmark sampling and annual reporting. Texas renewals are due Dec 28, 2026 →
Oil inventory, containment review and the written plan for facilities over 1,320 gallons. Check whether you need one →
Chemical inventory and Form R submissions, on time and defensible, every year.
VOC, HAP and PM recordkeeping against your permit conditions, so annual reports are a matter of adding up, not digging.
TCEQ and ODEQ correspondence, notices of change and waste questions, answered by someone who speaks the language.
Under-permitting invites violations and shutdown orders. Over-permitting buys reporting burden and scrutiny you never needed. An analysis of your actual operation tells you what's required and what isn't.
Run the analysisBuilding instead of operating? SWPPPs, NOI filing, inspections and erosion control are handled by 2R Erosion & Sediment Control.
Visit 2resc.com →Used industrial solvents collected, distilled and returned, cutting disposal cost and regulated waste volume.
Visit Rice Environmental →Benchmark samples have to be pulled from a qualifying storm, at the outfall, inside a short window. We track the weather for the sites we manage and show up when it counts.
Texas renewals: due Dec 28, 2026Working documents with no strings. Use them whether you call us or not.
Six questions. The answer shows as you go, and you can ask for it in writing.
Free checker →A spreadsheet that adds up your oil storage and tells you whether you crossed 1,320 gallons, and which kind of plan you would need.
Free download · Excel worksheet →Thresholds, the chemicals shops forget to count, and what to check before you submit. Due March 1 every year.
Free download · PDF checklist →Most do need an authorization of some kind. Many qualify for a Permit by Rule if emissions and operating limits are met and records are kept. Which one fits depends on what you spray and how much.
If your industrial activities and materials are not exposed to rain or runoff, you may qualify for a no-exposure exclusion. It has to be certified, and it has to stay true.
Add up the capacity of every oil container of 55 gallons or more. Over 1,320 gallons aboveground, with a path for a spill to reach water, means you need one. Our free checker walks you through it.
March 1 each year, covering the previous calendar year.
That's the right question, and it's where we start.
Contact Us