A new contract can put your paint booth out of compliance overnight.
Most small coating operations in Texas run under a Permit by Rule. The limits are tied to how much you spray, so winning work can move you across a line.
I see this more than any other air problem. A shop paints under a Permit by Rule for years without trouble. Then it lands a bigger contract, the booths run two shifts, and the emissions that kept it under the rule are gone. Nobody changed anything except the volume.
A Permit by Rule comes with hourly and annual emission limits, and some of the smallest operations qualify without registering at all. Cross the next threshold and registration with TCEQ is required. Cross the top one and you are into a case-by-case permit, which takes months.
If a contract will double your coating use, run the numbers first. Registering ahead of the work is routine. Explaining to an inspector why you ran over for six months is not.
Ryan Rice, CRAME, is the principal consultant at 2R Safety Solutions. He ran safety and environmental compliance across multiple manufacturing facilities before starting 2R.
The renewal deadline for the Texas industrial stormwater general permit was pushed to December 28, 2026. Here is what has to happen before then.
Subpart HHHHHH of 40 CFR Part 63 reaches small shops that most people assume are too small for federal air rules.
Lead-acid batteries are the most commonly missed item on Tier II reports, because the threshold for the acid inside them is 500 pounds, not 10,000.