An air registration filed ahead of a new contract
A vehicle refinishing operation won work that would push its spray booths past the limits it had been operating under.
The facility ran two spray booths, cure ovens, a blast booth and a row of welding stations under the smallest tier of the coating rule. A new contract was going to raise throughput well past that.
The registration was in before the contract ramped up, and the plant has a monthly record showing it stays inside its limits.
Client details are withheld. Everything we see on site stays confidential between 2R and the client.
A growing fabrication shop had outgrown informal safety and needed air authorization for its coating work.
Read the case study →A steel fabricator needed its stormwater permit renewed and turned out to need an SPCC plan as well.
Read the case study →Tell us what is going on. You will hear back within one business day.
Contact Us